ASSEMBLY + Quality Show Booth 1310 · Rosemont, IL · Oct 27 to 29Oct 27, 4 to 7 PM · Oct 28, 10 AM to 5 PM · Oct 29, 9 AM to 2 PM · Show floor plan ASSEMBLY Show 2026 Thanks for visiting RELY at The ASSEMBLY Show and The Quality Show. Pick up where we left off below. Call 262.276.0050

Contract assembly, inspection and containment · Wisconsin

Your best people belong on the main line. Hand RELY the rest.

Free your people. Free your floor. Keep production moving.

RELY takes ownership of inspection, containment and rework, plus recurring subassemblies, production-ready kits and mature product lines, so your team gets time and space back for the work driving growth.

Talk through my project

Start with one operation or one NCR. No complete RFQ required.

See the results

Assembly and production transfers

Pick one operation. Build from proof.

  • 700assembly hours saved in the first three months
  • 2,000 sq ftof customer space freed

Case Study No. 20. Results reflect this program only.

Quality and containment

Bring us one NCR, hold tag or recurring quality problem.

  • 8,000+customer hours reclaimed in 2025
  • 4 hrsaverage response on a supplier NCR

Case Study No. 17. Results reflect this program only.

  • ISO 9001:2015 certified
  • Women-owned
  • Documented work instructions
  • Menomonee Falls, Wisconsin

52,000 sq ft facility · 4.5M+ parts assembled in 2025

Where RELY fits

What is pulling your team off the line?

  1. TodaySorting, rework and offline builds in your plant

  2. The moveDefined work runs at RELY, at your facility or ours

  3. NextYour people back on core production

How the model works. Illustrative: what frees up depends on the work moved.

Contract assembly and subassembly

Your best assemblers belong on your main line.

Which subassembly would you gladly stop building?RELY takes over recurring subassemblies, component procurement and production-ready kits, built to your print and delivered checked and line-ready.

Case Study No. 20: a 2,000 sq ft subassembly area shut down and 700 assembly hours saved in the first three months. See the case

Inspection, containment and rework

The defect isn't your only cost.

One suspect lot creates inspection, rework, held inventory, supplier coordination and production people pulled off the line. RELY runs the agreed work to your criteria, with lot-level reporting, at your facility or ours.

Case Study No. 17: 8,000+ customer hours reclaimed and 4.4M+ parts sorted in 2025. See the case

Parts on hold now? Call 262.853.1634. We respond to urgent sorting and containment inquiries within one business hour.

Production transfers

Keep the product. Move the production.

Found your next machine?RELY takes on mature assembly, non-core production, and legacy or service-parts programs. Equipment, tooling, fixtures, test systems, work instructions and material can move with the work.

Case Study No. 21: 3 legacy product lines transferred and 10 UL part numbers requalified through PPAP. See the case

Supplier quality programs

Your team keeps the authority. Not the workload.

You set acceptance criteria, boundaries, disposition and release. RELY runs crew deployment, training, supervision, segregation and reporting.

Where your commercial process allows, the supplier can fund the work directly. Customer approval or site access may still be required.

Results

Programs that put people back on core production.

Case Study No. 20 · Subassembly

2,000 sq ft

Space freed at the customer

The problem
A water heater manufacturer tripling sales had subassembly builds pulling its most experienced assemblers off the main line.
Result
A 2,000 sq ft subassembly area, including storage, shut down at the customer. 700 assembly hours saved in the first three months.
How RELY handled it

What RELY took onTurnkey subassembly and kits, component procurement across 150+ SKUs, and kits shipped ready to crate with the customer's QC checklist.

Volume2,400+ subassemblies per month.

Case Study No. 17 · Supplier containment

8,000+

Customer hours reclaimed in 2025

The problem
A manufacturer with two facilities and 16 global suppliers had parts failing incoming inspection or tripping in-line equipment faults, with no dedicated resource to sort, hold and chase suppliers.
Result
4.4M+ parts sorted in 2025, with supplier NCR response averaging 4 hours in this program.
How RELY handled it

What RELY took onIncoming inspection and sortation, supplier communication and RMA coordination, in-transit interception, and daily and weekly lot-level reporting by failure mode.

Where it runsWhat started as a two-week onsite proof of concept now runs 99% at RELY. RELY handles the trucking both ways.

Case Study No. 21 · Production transfer

10

UL part numbers requalified through PPAP

The problem
A major appliance OEM's incumbent supplier exited three UL product lines. The tooling could ship in a truck. The responsibility could not.
Result
3 legacy product lines transferred to RELY. The customer installed three molding presses in the space the initial assembly-line transfer released.
How RELY handled it

What RELY took onTooling requalification, supplier and BOM continuity, and full PPAP start to finish under RELY's name.

Supply chain85 raw-material and component SKUs planned and stocked.

More results

  • No. 16 · High-volume containment172M+ parts inspected since 2023, run as a program with failure-mode reporting and revision-controlled work instructions. Read online · PDF
  • No. 18 · Inspection and rework2,500+ parts inspected and reworked with 0 line stoppages at the customer's plant. Read online · PDF
  • All case studiesAssembly, containment, fulfillment, transfer and wire harness programs. See the library

The first conversation

Start with one operation or one NCR.

  1. Define the problem

    The part, volume and current process, or the supplier, failure mode and NCR. A short description is enough.

  2. Agree the scope and controls

    Criteria, boundary samples, reporting and release path for quality work. Print, fixtures and cadence for assembly.

  3. Run a defined pilot

    A set scope, measured against what you agreed. Then decide what else makes sense to move.

You do not need a BOM, a technical package or a large program to start. Bring one NCR, one hold tag or one operation. Your team keeps acceptance criteria and disposition authority throughout.

Start the conversation

What would you like to take off your team?

Tell us what is happening. We'll review the fit and identify the next practical step.

Need an NDA? Start with a general description. We'll arrange the next step before confidential files are shared.

This field is for validation purposes and should be left unchanged.
What is tying up your team? (optional)
A few sentences is plenty. Please leave out confidential details for now.