Case study · No. 2021
Kit configurations built across 150+ component SKUs

RELYService family·Contract assemblyFinal & subassembly
For operations and plant leadership
Free your production team from the assembly work holding it back.
RELY builds mechanical and electromechanical final assemblies and subassemblies for OEMs with recurring programs. We take labor-intensive builds off your line so your people, floor space and management attention go back to higher-value production. ISO 9001:2015 certified, building at our Menomonee Falls, Wisconsin facility in the Milwaukee area or inside your plant.
In one water-heater manufacturing program, RELY saved the customer 700 assembly hours in the first three months.Case Study No. 20 · Result from that program only
Start with a print, a BOM, a sample or a description of the work. A complete RFQ is not required.
Assembly cell · RELY floor
Where RELY fits
RELY is a strong fit when the work still matters to your customer but no longer makes sense inside your core production flow: recurring production, complex or labor-intensive assembly, high-mix programs, service parts, product transfers and supplier transitions. The work does not need to be temporary or simple.
Where we are usually not the right fit: highly automated commodity production decided almost entirely by the lowest unit price at extreme scale, or work that needs specialized equipment or certification RELY cannot support economically. We would rather say so early.
When demand outgrows your line, RELY acts as an OEM manufacturing partner for defined assembly work. We take the labor-intensive builds so your people and floor space stay on core production, with work instructions, quality checks and reporting agreed up front.
Case No. 20
2,400+
Subassemblies produced per month for a water heater manufacturer
Case No. 20
2,000
Square feet of production space freed for higher-value production
Case No. 13
<4 wks
From go-ahead to production at RELY for a transferred assembly program
Quality system
ISO 9001:2015
Certified for contract manufacturing and assembly
From RELY Case Studies No. 20 and No. 13 and the Amtivo ISO 9001:2015 certificate. Each figure applies to the program named and is not a standard lead time.
Two common starting points
Both start the same way. RELY observes the current work, documents it in visual instructions with inspection points, and proves it in a practical pilot before volume moves.
Case Study No. 13. A Wisconsin injection molder wanted mask assembly moved from out of state to sit closer to its molding operation. RELY time-studied the work before the move, so the labor requirement was known, then had production running at RELY in under four weeks from go-ahead.
RELY assembled 104,609 masks from April 2021 to May 2022. The same customer then moved six more product lines to RELY: seven lines and 210,689 units in total through August 2022.
Case Study No. 22. A medical diagnostics developer relied on its scientists to assemble cartridges by hand. RELY observed the builds, documented the work in 18 visual assembly and inspection steps with three critical-to-quality gates, and joined a three-day build at the customer’s lab eight weeks after the first process walk.
That joint build produced 1,100 cartridges, combined output with the customer’s team. RELY later assembled 300 cartridges at its own facility in fall 2022.
Process documentation is part of launching contracted assembly at RELY, not a standalone engineering service. Product design, acceptance criteria and release stay with your team.
How work moves to RELY
Print, BOM, volume, timing, materials and quality requirements reviewed together.
Output: agreed scope and who owns whatWork instructions, fixtures, material flow and inspection points built around the approved revision.
Output: documented process and control pointsFirst articles or a pilot run confirm method, cycle time, checks and documentation.
Output: pilot results you approveKPIs, reporting cadence and an agreed change-control path for engineering changes.
Output: stable production and a change processBuilt in
Checkpoints and functional checks built into the sequence, not added at the end.
Documented
Revision-controlled instructions, training records and operator sign-off against the work.
Traceable
Nonconformance control and ERP-supported production visibility, matched to the program’s requirements.
Capability

Materials
All three models are available. The quote defines how materials work for your program, so nobody discovers the rules during the first shortage.
| Decision | What gets agreed |
|---|---|
| Purchasing | Who buys each component, and for which part numbers. |
| Approved suppliers | Which sources are approved and who manages them. |
| Ownership | Who owns inventory at each stage, including consigned material. |
| Replenishment | Lead-time responsibility, minimums and how material is reordered. |
| Shortages | How shortages are flagged, escalated and resolved. |
| Engineering changes | How revisions are introduced and how affected stock is handled. |
| Excess and obsolete | How leftover or superseded material is treated. |
| Inventory reporting | What you see, and how often. |
Production transfers & service parts
RELY supports transfers from customer facilities and incumbent suppliers, including customer-owned equipment and service-parts programs. The full transfer process and inventory models live on the Production Transfers page. For a complex handoff with inherited tooling, obsolete material and full requalification, read Case Study No. 21.
Supporting installed equipment? See how RELY runs OEM service-parts and aftermarket programs.
Example: appliance switch assembly. RELY first ran a semi-automated switch assembly line inside the customer’s facility, created work instructions, quality inspection instructions and PM instructions, then moved the equipment into RELY’s facility. The customer used the freed space to install three new injection molding presses. Two more appliance switch assembly lines moved to RELY two years later.
Case studies
Case study · No. 2021
Kit configurations built across 150+ component SKUs
Case study · No. 2110
UL part numbers requalified through full PPAP
Questions buyers ask
Both. Programs can use customer-supplied or consigned material, RELY-procured material, or a hybrid. The quote defines purchasing, approved suppliers, ownership, lead-time responsibility, excess material and how shortages or engineering changes are handled.
Full answer: materialsYes. A pilot can confirm the assembly method, cycle time, quality checks, documentation, material flow, testing and training. Both teams agree beforehand on what the pilot must show and who approves the result.
Full answer: pilotsWith approved BOMs, revision-controlled work instructions, product identification, training controls and defined verification points. The configuration and revision are set before production, and engineering changes go through the agreed change-control process.
Full answer: revisionsRELY evaluates customer-owned equipment, tooling, fixtures and test systems as part of a transfer: condition, utilities, safety, maintenance, training, process capability and facility fit. Ownership, relocation, maintenance and eventual return or disposition are documented.
Full answer: equipment transfersWhatever you have: drawing, BOM, annual demand, order quantity, a sample, work instructions, photos, current cycle time, required start date, quality, test and traceability requirements, packaging and material responsibility. If the package is incomplete, start the conversation anyway.
Full answer: quote inputsShare a print, a BOM, a sample or a description of the work, with expected volume and timing if you know them. A complete RFQ is not required for an initial fit review. Need an NDA first? Tell us and we start there.
Or call 262.276.0050 · info@relycm.com