RELY Contract Manufacturing FAQs
Contract Manufacturing, Assembly & Quality FAQs
A production backlog. Parts on hold. A supplier problem. A mature product consuming floor space you need for growth.
Before moving the work, you need to know who will own the process, how quality will be controlled, whether the supplier can actually handle your requirements, and what it will take to launch.
RELY Contract Manufacturing supports manufacturers with contract assembly, production transfers, wire harnesses, control panels, part sorting, containment, rework, kitting, packaging, and fulfillment.
Bring us the drawing, sample, work instruction, or production problem. We will help determine the right scope and next step.
Parts on hold or production at risk? Call RELY’s urgent sorting and containment line: 262.853.1634. General questions: 262.276.0050.
Getting Started & Program Fit
1. What does RELY Contract Manufacturing do?
RELY manages defined manufacturing and production-support programs for OEMs and other manufacturers.
Our work includes contract assembly, mechanical and electromechanical subassemblies, wire harnesses, cable assemblies, control panels and enclosures, part sorting, quality containment, inspection, testing, rework, kitting, packaging, and fulfillment.
Programs can also include component procurement, customer-owned equipment transfers, service-parts production, and supplier transitions. You can move one operation, one product family, or a broader recurring manufacturing program.
2. What types of manufacturing programs are the best fit for RELY?
RELY is a strong fit for recurring production, complex or labor-intensive assembly, high-mix programs, service parts, product transfers, supplier transitions, containment, and work that consumes more internal labor, floor space, or management attention than it should.
We are especially relevant when the work still matters to your customer but no longer makes sense inside your core production flow.
The work does not need to be temporary or simple.
3. What types of programs are usually not a good fit?
RELY is generally not the strongest fit for highly automated commodity production where the buying decision is driven almost entirely by the lowest possible unit price at extreme scale.
Programs may also be unsuitable when specialized equipment, certification, or technical capability is required and cannot be economically or operationally supported.
We would rather tell you early that a program is not a fit than force the wrong work into our operation.
4. Can RELY support both high-volume and high-mix manufacturing?
Yes.
RELY supports prototype and low-volume work, high-mix recurring programs, and substantially larger production and quality programs.
Capacity is evaluated by the actual process rather than by a generic unit-count promise. We review cycle time, product mix, equipment, material flow, staffing, training, and quality requirements against the output you need.
Historical volume from one service is not automatically presented as capacity for another.
5. Does RELY work with both established OEMs and growing companies?
Yes.
Established manufacturers often use RELY to transfer mature work, relieve internal capacity constraints, stabilize supplier problems, or simplify operations.
Growing companies may use RELY to turn early manual builds into repeatable production processes with documented work instructions, defined quality controls, and scalable labor.
In both cases, the objective is controlled manufacturing execution rather than simply adding more hands.
6. Can RELY perform work at our facility?
Yes.
For suitable programs, RELY can manage defined work inside a customer or supplier facility, including sorting, inspection, rework, containment, and selected production activities.
The scope defines supervision, operator training, work instructions, quality checks, material handling, reporting, and responsibility.
This is not a staffing model where your team simply supervises additional people. RELY manages the contracted work.
7. Can RELY combine multiple services into one program?
Yes.
A program can combine assembly, harness production, testing, inspection, kitting, packaging, and fulfillment.
For example, RELY can build a wire harness, install it into a subassembly, inspect the completed assembly, place it into a service kit, and ship the finished kit under one program.
That reduces the number of handoffs and suppliers your team has to manage.
This is why ITW refers to RELY as their 80:20 company.
Contract Assembly & Subassembly
8. What types of contract assembly does RELY perform?
RELY performs mechanical and electromechanical assembly, final assembly, and subassembly work to approved customer requirements.
Programs can include component installation, wiring integration, PVC subassemblies, electrical modules, control boxes, labeling, testing, packaging, and other defined assembly operations.
The production process is built around the approved product requirements, assembly sequence, revision, material flow, and inspection plan.
9. Does RELY support electromechanical assembly?
Yes.
RELY supports electromechanical assemblies that combine mechanical components with wiring, connectors, controls, electrical modules, and other approved components.
Share the drawing, schematic, BOM, testing requirements, expected demand, and any customer-specific workmanship requirements so the proposed manufacturing scope can be reviewed correctly.
10. Can RELY prepare line-ready components and subassemblies?
Yes.
RELY can move preparation work away from your main production line by supplying preassembled components, prepared wire, labeled parts, hardware kits, line-ready materials, and completed subassemblies.
The goal is to keep skilled internal operators focused on the work that actually needs to remain on your primary line.
11. Can RELY manage multiple part numbers, configurations, and revisions?
Yes.
RELY uses approved bills of materials, revision-controlled work instructions, product identification, training controls, and defined verification points to manage product variation.
The applicable configuration and revision are established before production begins.
Engineering changes are reviewed through the agreed change-control process rather than becoming informal decisions on the production floor.
12. Can RELY help improve our manufacturing process?
Yes.
RELY can support process development, time studies, assembly sequencing, work instructions, layouts, fixtures, jigs, and production-flow improvement.
We look for opportunities to improve repeatability, reduce unnecessary handling, simplify training, and prevent errors.
Automation can also be evaluated when volume and program economics justify it.
Product-design authority remains with the appropriate customer or engineering owner unless a separate scope states otherwise.
13. Can we supply components, or can RELY manage the materials?
Both models are available.
Programs may use:
- Customer-supplied or consigned material.
- RELY-procured material.
- A hybrid arrangement.
The quote defines who purchases each component, approved suppliers, inventory ownership, lead-time responsibility, excess-material treatment, and how shortages or engineering changes are managed.
14. Can RELY support food and beverage equipment components?
Yes.
RELY can support approved assembly and subassembly programs for food and beverage applications, including programs requiring defined food-safety controls.
The process can include controlled material handling, documented work instructions, chemical controls, training, traceability, inspection, and application-specific production controls.
Requirements are reviewed against the specific product, material, and intended use before launch. Food-contact component assembly, finished-product secondary packaging, and actual food processing are different scopes and are evaluated accordingly.
Production Transfers, Equipment & Service Parts
15. Can RELY take over an existing product line?
Yes.
RELY supports manufacturing and assembly transfers from customer facilities and incumbent suppliers.
A transfer may include inventory, customer-owned equipment, tooling, fixtures, work instructions, bills of material, purchasing responsibility, test requirements, and production knowledge.
We identify what must physically move, what must be recreated, and what must be validated before production is released.
16. Can RELY take over work from a failing or capacity-constrained supplier?
Yes.
RELY can evaluate an existing program and build a transition plan around current demand, open orders, tooling, inventory, documentation, quality requirements, and customer approvals.
Depending on the program, the transition can use pilot builds, staged SKU transfers, parallel production, or advance inventory to reduce supply risk.
17. Can customer-owned equipment move to RELY?
Yes.
RELY can evaluate customer-owned equipment, tooling, fixtures, test systems, and other production assets as part of a transfer.
Before accepting equipment, we review condition, utilities, safety requirements, maintenance, operator training, process capability, and facility fit.
Ownership, relocation responsibility, maintenance responsibility, and eventual return or disposition are documented as part of the program.
18. How does RELY protect supply during a production transfer?
Supply continuity is addressed as part of the transfer plan.
Depending on the program, that may involve:
- Advance inventory.
- Pilot builds.
- Staged product transfers.
- Parallel production.
- First-article approval.
- Run-at-rate validation.
- Defined cutover gates.
The objective is not simply to move the equipment. It is to move the process without unnecessarily putting customer supply at risk.
19. How long does a manufacturing transfer take?
It depends on the program.
A documented assembly with available materials and no new equipment can move much faster than a production cell that requires equipment relocation, utility changes, qualification, tooling modification, and customer approval.
RELY establishes the timing after reviewing the actual dependencies rather than applying a generic transfer lead time.
20. Does RELY support service parts and legacy products?
Yes.
Service parts, aftermarket programs, and legacy production are strong fits when those products remain important to your customers but no longer belong on your main production line.
RELY can support manufacturing, assembly, procurement, kits, packaging, fulfillment, and customer-owned equipment within the agreed scope.
21. Can we begin with a pilot before transferring the full program?
Yes.
A pilot can confirm:
- Assembly method.
- Cycle time.
- Quality checks.
- Documentation.
- Material flow.
- Testing.
- Training requirements.
Both teams agree beforehand on what the pilot needs to demonstrate and who approves the results.
22. What if our customer must approve the manufacturing-location change?
Then that approval becomes part of the transfer plan.
Share the applicable customer or supplier manual, notification requirements, required approval package, and timing early.
RELY can support the agreed documentation and validation work, while formal approval remains with the responsible customer or OEM.
Part Sorting, Quality Containment, Inspection & Rework
Supplier based outside the U.S.? International suppliers: how RELY supports U.S. holds
23. What is third-party part sorting?
Third-party part sorting uses an independent outside team to inspect suspect product against defined criteria and separate acceptable material from nonconforming material.
RELY manages the sorting process, operator training, work instructions, segregation, identification, and reporting.
The customer, supplier, or authorized quality representative establishes or approves the acceptance criteria.
24. When should we use third-party sorting or quality containment?
Typical triggers include:
- Incoming parts fail inspection.
- A customer rejects a shipment.
- A defect is discovered after inventory has already been produced.
- A supplier quality issue threatens your production line.
- Material is placed on hold pending verification.
- Your customer requires independent containment.
- Internal quality personnel cannot absorb the volume.
The immediate objective is to protect production and control suspect inventory while the underlying cause is addressed.
25. Where can RELY perform sorting and containment?
RELY can support sorting and containment:
- At the customer’s plant.
- At a supplier’s plant, with authorization.
- At RELY’s facility in Menomonee Falls, Wisconsin.
The best location depends on where the material is, how quickly conforming product is needed, the inspection method, available space, handling requirements, and shipping economics.
26. How quickly will RELY respond to an urgent sortation or containment request?
RELY responds to urgent sortation and containment inquiries within one business hour. For parts on hold or production at risk, call RELY’s urgent sorting and containment line: 262.853.1634.
We are also frequently accessible outside normal business hours when a production problem cannot wait until the next workday.
Actual deployment and completion timing depend on the defect criteria, quantity, location, inspection method, equipment, access, and how quickly the required information is available.
Once the scope is defined, RELY moves quickly to establish a controlled response plan.
27. Can RELY move faster than our existing sorting provider?
In many situations, yes, depending on scope and capacity.
In one recent Midwest program, the manufacturer’s normal subsidized sorting provider quoted 12 to 14 weeks to complete a roughly 100,000-part sort.
RELY reviewed the application on-site, received the affected components on Monday, completed the sort, and shipped the program in less than three days.
That is an example of one specific project, not a blanket turnaround guarantee. The point is that when timing matters, RELY is willing to review the work and build a response around the actual production need.
28. What does RELY need to start an urgent sort?
Send us:
- Part number and revision.
- Quantity and affected lots.
- Defect description.
- Approved acceptance criteria.
- Photos, drawings, or reference samples.
- Material location.
- Required timing.
- Inspection or test equipment requirements.
- Minimum quantity needed to protect the next build or shipment.
- The person authorized to approve disposition.
If an NDA is required before drawings or quality information can be shared, tell us immediately.
29. What inspection and testing can RELY perform during containment?
RELY supports inspection and testing based on the customer-defined requirement.
This can include:
- Visual inspection.
- Dimensional checks.
- Go/no-go inspection.
- Electrical testing.
- Functional testing.
- 100% inspection.
- Defined sampling plans where approved.
- Custom gauges, fixtures, or test setups where appropriate.
We define exactly what characteristic is being inspected or tested and what constitutes acceptance before work begins.
30. What happens to rejected parts?
Rejected material is segregated, identified, and controlled so it cannot be confused with accepted product.
Disposition may include:
- Return to supplier.
- Hold for customer decision.
- Approved rework.
- Component recovery.
- Scrap.
RELY follows the agreed disposition authority and does not independently release rejected material without authorization.
31. Can RELY rework defective product instead of scrapping it?
Yes, when an approved rework method can restore the product to the required condition.
Work can include:
- Assembly correction.
- Component replacement.
- Wiring correction.
- Relabeling.
- Repackaging.
- Disassembly.
- Component recovery.
Reworked product is then inspected or retested against the approved release criteria.
32. What reporting will we receive during sorting or rework?
Reporting can include:
- Quantity inspected.
- Quantity accepted.
- Quantity rejected.
- Defect counts.
- Defect categories.
- Affected lots.
- Rework quantities.
- Material available for release.
- Photos and supporting documentation.
The reporting cadence and format are agreed at launch based on the customer’s requirements.
Controlled Shipping & Supplier Containment
33. Does RELY support Controlled Shipping Level 2?
Yes.
RELY has repeatedly supported customer-required Controlled Shipping Level 2, often referred to as CS2, along with other third-party containment requirements.
Exact requirements vary by customer, so RELY reviews the actual containment notice, inspection requirements, reporting format, and exit criteria before the program begins.
34. What does RELY do during a Level 2 controlled-shipping program?
RELY can support:
- Inspection against defined defect criteria.
- Segregation of defective parts and identification of accepted product.
- Regular reporting of inspection quantities, defects, and results.
- Customer-defined exit criteria, including evidence that corrective action is effective and formal approval to end containment.
The exact reporting, inspection, identification, and release requirements are defined by the customer.
35. Is RELY automatically approved as a CS2 provider for every OEM?
No.
Some customers require formal approval of the independent containment provider before work begins.
RELY has been accepted for Level 2 controlled-shipping work in multiple customer environments, but approval for one customer or program does not automatically establish approval for another.
Send us the containment notice and customer requirement. We will confirm the required process.
36. Who normally pays for Controlled Shipping Level 2?
Often, the supplier responsible for the nonconformance pays for the additional containment.
The exact commercial arrangement depends on the customer requirement and purchasing process.
RELY can work directly with the responsible supplier when the supplier authorizes the work and accepts the commercial terms.
37. Can RELY bill the supplier responsible for the sorting or rework?
Yes.
Supplier-funded containment is common when the responsible supplier authorizes RELY to perform the work.
We confirm:
- Purchasing entity.
- Purchase-order requirements.
- Scope.
- Reporting expectations.
- Billing terms.
That allows the receiving plant to get the containment support it needs without becoming the administrative middleman between the supplier and the sorting provider.
38. How do we exit controlled shipping?
Exit criteria are defined by the customer requiring containment.
RELY can provide the inspection data and reporting needed to demonstrate that the corrective action is working.
The containment program continues until the customer’s required criteria are met and the appropriate party provides formal authorization to end containment.
Wire Harnesses, Cable Assemblies & Electrical Assembly
39. Does RELY build custom wire harnesses?
Yes.
RELY supports wire and cable harness prototyping, engineering builds, low-volume work, production programs, and rework.
Projects range from simple cable assemblies to complex wire harnesses containing hundreds of components.
Programs can stand alone or be integrated into electromechanical assemblies, panels, service kits, or retrofit kits.
40. What wire sizes and materials can RELY support?
RELY currently supports wire sizes from 8 through 22 gauge across multiple colors and jacket materials.
Available constructions include:
- PVC.
- GXL.
- TXL.
- Silicone.
- TPE.
The specific wire specification is reviewed against the customer drawing and BOM before quoting.
41. What connector families does RELY support?
Current examples include:
- Bosch.
- Delphi/Aptiv.
- Deutsch.
- Molex.
- TE/AMP.
Other connectors can be reviewed as part of the application.
The correct question is not simply whether RELY has used a brand before. We review the connector, terminal, tooling, crimp requirements, inspection method, and expected volume for the actual build.
42. What harness protection and sleeving options does RELY support?
Current options include:
- Woven braid.
- Slit conduit.
- Solid conduit.
- Heat-shrink tubing.
- Spiral wrap.
Additional requirements can be evaluated from the drawing or sample.
43. Does RELY use custom build boards?
Yes.
RELY can create custom harness build boards from customer prints.
Build boards are reviewed before production and help control routing, branch locations, component placement, lengths, and repeatability.
44. How are wire harnesses tested?
Every completed harness is 100% continuity tested.
Custom test boards or mating harnesses can also be developed or used when appropriate to the program and volume.
Electrical testing is combined with the applicable workmanship and visual-inspection requirements because continuity alone does not verify every mechanical or application requirement.
45. What is RELY’s typical wire-harness lead time?
The current standard build target is approximately 10 business days once required components are procured, subject to component availability and program requirements.
Prototype, urgent, high-complexity, transferred, or material-constrained programs may differ.
The actual quote and confirmed launch plan govern the specific project.
46. Can RELY build cable assemblies?
Yes.
RELY assembles cable assemblies within its electrical-manufacturing scope.
Share the cable type, connectors, terminals, lengths, labeling, protection, test requirements, and expected quantity so we can confirm the process.
47. Does RELY assemble control panels and control boxes?
Yes.
RELY performs control panel, control box, and enclosure assembly to customer drawings, schematics, and bills of material.
Scope can include:
- Component mounting.
- Terminal blocks.
- DIN rail.
- Wiring.
- Circuit labeling.
- Electrical assembly.
- Agreed inspection and testing.
Product-listing or certification requirements are reviewed at the RFQ stage so RELY does not imply a listing that is outside the approved scope.
48. Can RELY take over a harness program from another supplier?
Yes.
A harness transfer typically starts with:
- Approved drawings.
- Samples.
- BOM.
- Open demand.
- Components.
- Build boards.
- Test requirements.
- Tooling.
- Workmanship criteria.
RELY identifies documentation gaps, material risks, test requirements, and tooling needs before establishing the transfer plan.
49. What should we send for a wire-harness quote?
Send:
- Drawing or schematic.
- BOM.
- Pinout or connection schedule.
- Annual demand.
- Order quantity.
- Required timing.
- Wire specifications.
- Connectors and terminals.
- Labels.
- Sleeving or protective materials.
- Testing requirements.
- Customer workmanship requirements.
- Any customer-supplied tooling or components.
A representative sample can also be helpful.
Industrial Kitting, Packaging & Fulfillment
50. What industrial kitting services does RELY provide?
RELY builds kits to an approved bill of materials for production, installation, service, repair, aftermarket, and retrofit programs.
Kits may contain:
- Purchased components.
- Hardware.
- Wire harnesses.
- RELY-built subassemblies.
- Labels.
- Instructions.
- Customer-supplied material.
The finished output can be a line-ready production kit, technician kit, dealer service kit, retrofit kit, or customer-specific configuration.
51. Can RELY build components and place them into the final kit?
Yes.
This is one of the advantages of combining contract manufacturing and kitting.
RELY can manufacture a subassembly or harness, inspect it, combine it with other purchased or customer-supplied components, and package the completed kit.
That reduces handoffs between separate assembly and fulfillment providers.
52. How does RELY verify kit contents?
Kit verification is built around:
- Approved BOM.
- Required quantities.
- Revisions.
- Labeling.
- Packaging instructions.
- Program-specific checks.
The process is designed to reduce missing, incorrect, or obsolete components from reaching the customer or production line.
53. Can RELY hold inventory and ship on release?
Yes.
Programs can include inventory holding and scheduled releases.
The commercial agreement defines:
- Inventory ownership.
- Minimum inventory.
- Replenishment.
- Forecast requirements.
- Storage.
- Obsolescence.
- Revision changes.
- Reporting.
- Shipping responsibility.
54. Does RELY support food and beverage variety packs and secondary packaging?
Yes.
RELY supports approved variety-pack, multipack, bundle, and secondary-packaging programs for food and beverage products.
The process can include controlled product handling, lot and date-code requirements, packaging verification, labeling, storage, and traceability as required.
Program-specific food-safety controls are approved for production today.
The scope is still defined by the actual product and process. Secondary packaging is not the same as filling, formulation, or food processing.
55. Can RELY ship to distributors, retailers, Amazon, or end customers?
Yes.
RELY supports B2B and direct-to-customer fulfillment within an agreed program.
Destinations can include:
- Manufacturing plants.
- Distribution centers.
- Dealers.
- Retailers.
- Amazon.
- End customers.
Packaging, labeling, routing, carrier, and documentation requirements are established during onboarding.
56. What do you need to quote a kitting or packaging program?
Send:
- BOM or product list.
- Finished kit configurations.
- Kits per release.
- Annual demand.
- Expected order pattern.
- Packaging specifications.
- Labels.
- Photos.
- Shipping destinations.
- Required timing.
- Customer-supplied versus RELY-supplied materials.
- Lot or date-code requirements.
A finished sample can also help clarify expectations.
Quality, Traceability & Supplier Qualification
57. Is RELY ISO 9001:2015 certified?
Yes.
RELY’s quality management system is certified to ISO 9001:2015 for Contract Manufacturing and Assembly.
Certificate 263741 was issued by Amtivo and is valid through March 19, 2027, subject to annual assessments.
RELY also holds Certified Food & Beverage Warehouse and UL certifications, with SQF in progress.
58. How does RELY control operator training and consistency?
RELY uses documented work instructions, training records, operator qualification, visual work instructions, defined inspection steps, and layered process audits.
Fixtures, build boards, gauges, reference samples, and other error-reduction methods are used where appropriate.
The goal is to make the process repeatable and less dependent on tribal knowledge.
59. Can RELY support PPAP, APQP, and first-article requirements?
Yes.
RELY supports agreed:
- PPAP.
- APQP.
- Control plans.
- Process flows.
- First-article activities.
- Customer-specific launch documentation.
The required approval level and deliverables are defined by the customer and agreed during launch.
60. Does RELY support lot traceability?
Yes.
RELY can structure traceability around the program’s requirements.
That may include:
- Incoming material lot.
- Component lot.
- Work order.
- Finished-product lot.
- Inspection results.
- Test results.
- Shipment records.
Tell us early whether you need finished-product lot traceability only or complete raw-material-to-finished-product traceability. They are not the same requirement.
61. What happens if RELY identifies a nonconformance?
The immediate priority is containment.
Depending on the issue, that may include:
- Stopping affected production.
- Holding suspect inventory.
- Identifying affected lots.
- Reviewing completed product.
- Adding inspection.
- Notifying the customer.
The issue is then investigated and the appropriate root-cause and corrective-action process is followed.
62. How will we track performance?
Program KPIs are agreed around the work.
Depending on the program, these can include:
- Output.
- Quality.
- On-time delivery.
- Inventory accuracy.
- Defect rates.
- Throughput.
- Open corrective actions.
- Response and communication requirements.
The reporting cadence is matched to the program. Stable recurring production does not need the same communication frequency as an active containment event.
63. Who is our primary point of contact?
Each program has an identified primary contact responsible for coordinating the work across operations, quality, engineering, supply chain, and other required functions.
The intent is clear accountability rather than forcing the customer to chase multiple departments.
64. What evidence can we review before qualifying RELY?
Depending on the program, buyers can review:
- Current ISO certificate.
- Relevant program examples.
- Proposed quality controls.
- Work-instruction approach.
- Traceability requirements.
- Inspection or testing method.
- Pilot builds.
- Qualification documentation.
- Case studies.
- Facility and process review.
The most useful qualification discussion focuses on work comparable to the application you are considering.
Pricing, Commercial Terms & Launch
65. How does RELY price contract manufacturing?
Pricing depends on:
- Labor content.
- Material responsibility.
- Setup.
- Equipment.
- Tooling.
- Quality requirements.
- Testing.
- Packaging.
- Volume.
- Scheduling.
- Inventory.
- Freight and logistics.
Repeatable production is often quoted per unit after the process has been defined and time studied.
Unstable or changing work may begin under a different commercial model.
66. When does hourly pricing make sense?
Hourly pricing is appropriate when the scope is still changing or when a reliable piece rate cannot yet be established.
Examples include:
- Emergency sorting.
- Troubleshooting.
- Pilot builds.
- Incomplete documentation.
- Development work.
- Early rework programs.
- Programs with frequent engineering changes.
Once the process stabilizes, RELY can evaluate a transition to unit pricing where appropriate.
67. Does RELY have minimum order quantities?
Minimum order quantities are program-specific.
Setup, tooling, material procurement, changeover, cycle time, and release frequency all affect the practical minimum.
A pilot quantity may be very different from the most economical recurring production quantity.
68. Can pricing improve as a program matures?
Yes.
RELY evaluates:
- Process flow.
- Layout.
- Tooling.
- Fixtures.
- Training.
- Automation.
- Material presentation.
- Packaging.
- Labor efficiency.
When sustainable improvements change program economics, pricing can be reviewed according to the commercial agreement.
69. What information does RELY need to quote a project?
Send as much of the following as you have:
- Drawing.
- BOM.
- Annual demand.
- Order quantity.
- Sample.
- Work instructions.
- Photos.
- Current cycle time.
- Required start date.
- Quality requirements.
- Testing.
- Traceability.
- Packaging.
- Material responsibility.
- Tooling.
- Shipping requirements.
If the package is incomplete, start the conversation anyway.
70. Can we contact RELY before the RFQ package is complete?
Yes.
You do not need a perfect RFQ to begin.
A sample, partial drawing, photograph, current process, or clear description of the problem can be enough for RELY to identify what information is missing.
Final production still requires approved requirements, but discovery can start much earlier.
71. Can we send confidential drawings under an NDA?
Yes.
Tell RELY that an NDA is required before sending proprietary information.
The NDA can be addressed first, then drawings, BOMs, supplier information, and other sensitive data can be exchanged through the appropriate channel.
72. How should we compare outsourcing with doing the work in-house?
Do not compare only the hourly wage of an internal operator with a supplier piece price.
Consider:
- Supervision.
- Training.
- Quality.
- Material handling.
- Equipment.
- Floor space.
- Scheduling.
- Overtime.
- Inventory.
- Rework.
- Management attention.
- What your internal resources could produce instead.
The real question is whether the work belongs inside your operation and what capacity is released if it moves.
73. What happens after we contact RELY?
RELY reviews:
- The work.
- Volume.
- Timing.
- Material responsibility.
- Quality requirements.
- Technical requirements.
- Operational problem.
The next step may be:
- Technical review.
- NDA.
- Site visit.
- Sample evaluation.
- Time study.
- Pilot build.
- Quote.
- Transfer plan.
The goal is to define enough of the program that both teams understand what RELY owns and what must happen before launch.
What Work Needs a Better Production Home?
- A recurring assembly.
- A mature product taking up valuable floor space.
- A wire harness program that needs a second source.
- A supplier quality problem putting the next shipment at risk.
- A kit your internal team should not be spending hours building.
Tell us what needs to move, the volume you need, and the requirements that cannot change.
RELY will help determine the right scope and next step.
