RELY · Case Study · Seasonal assortment kittingNO. 9
SEASONAL ASSORTMENT KITTING · E-COMMERCE RETAILER
Every bag is a surprise. The mix can't be.
For an e-commerce retailer, RELY sorted and graded mixed collectible stock and built four-piece grab bags to a set value mix, with no duplicate bag combination inside any bulk shipping container.
View the original PDF- 325,000+Grab bags built and releasedOct 2021 to Dec 2022
- 1.3M+Pieces kitted325,707 bags x 4 pieces
- 0Customer complaints on bag mixAcross 325,000+ bags
- 120,900Bags in seven consecutive weekly releases
More than filling bags. A controlled assortment program.
An e-commerce retailer needed a partner to turn bulk, customer-supplied collectibles into themed grab bags with the right value mix in every bag, and keep them shipping through peak season.
WHAT HAD TO BE RIGHT IN EVERY BAG
- 01
Set value mix
Low, mid and high pieces in every bag.
- 02
No duplicate combinations
No duplicate bag combination inside a bulk shipping container.
- 03
Off-spec stock handled
Wrong-size and off-theme stock pulled, inventoried and returned.
PROGRAM TIMELINE, 2021 TO 2022
- OCT 12, 2021
Launch: 40,327 bags, all four assortments
- JAN TO MAR 2022
Replenishment: 86,700 bags
- OCT 4 TO NOV 14
Seven consecutive weekly releases
- DEC 28, 2022
Final program release
15 months: 29 inbound receipts, 49 work orders and 23 ship dates, matched to the season.
HOW RELY RAN THE PROGRAM
- Sort and grade every itemMixed bulk arrived with an estimated 15 to 20% wrong size or theme (RELY estimate). RELY sorted, catalogued and inventoried it, graded usable pieces, and returned the rest on labeled, inventoried pallets.
- Control every combinationEvery bag got a set count of low-, mid- and high-value pieces. No two bags in the same bulk shipping container (gaylord) carried the same combination. Zero customer complaints on bag mix, 325,000+ bags.
- Run four assortments side by sideUp to four themed assortments in one release. Each ran on its own work order and shipped as its own line.
- Release on the season's schedule12,200 bags in the slowest quarter. 132,685 in the peak quarter, including 120,900 across seven consecutive weekly releases. Volume followed demand, up and down.
Pieces kitted: 4 per bag x 325,707 bags = 1,302,828.
WHAT CAME NEXT
The relationship expanded. The same business later brought RELY a returns-grading project.
SOURCE: RELY INTERNAL PROGRAM RECORDS. HISTORICAL PROGRAM, OCT 2021 TO DEC 2022. CUSTOMER NOT NAMED. RESULTS REFLECT THIS PROGRAM ONLY AND ARE NOT A STANDARD LEAD-TIME OR CAPACITY COMMITMENT.
START HERE
Simple to sell. Complicated to assemble?
Tell us what has to be right in every assortment. Let's look at one seasonal or multi-variant program.