RELY · Quality Containment Series · Engineering capacityNO. 10
FOR ENGINEERING LEADERSHIP
Engineering should define the boundary. It should not have to run the sort.
Your engineers should spend their time on root cause and corrective action, not individual part calls, staffing questions and pallet counts.
View the original PDFEngineering / Quality owns
- Acceptance criteria and specification
- Measurement method
- Boundary samples / known limit conditions
- Disposition authority
- Root cause and corrective action
RELY owns
- Work-instruction build around the approved criterion
- Operator training and certification
- On-site labor and supervision
- Inspection / test execution
- Material control and count reconciliation
- Daily data / reporting
- Batched escalation of ambiguous conditions
One ambiguous part should not create one engineering interruption. RELY holds uncertain material and batches the decision points for review.
Define it once. Execute it consistently.
Keep engineering on the problem that ends the containment.
START HERE
Send the criteria, measurement method and boundary samples.
We'll build the execution plan.
